Overview
Work History
Education
Skills
Languages
Timeline
Generic

GIL CASAS

The Valley,ANGUILLA

Overview

5
5
years of professional experience

Work History

Concrete Pump Operator

ANGUILLA MASONRY PRODUCTS
THE VALLEY, ANGUILLA
01.2020 - Current
  • Inspected and maintained concrete pump equipment to ensure proper functioning.
  • Loaded, transported, and unloaded concrete materials from the truck to the desired location.
  • Operated the boom of the concrete pump in a safe manner for accurate placement of concrete material.
  • Monitored pressure gauges, hydraulic systems, and other components of the pump during operation.
  • Set up hoses, pipes and clamps at job sites according to specifications.
  • Performed regular maintenance on equipment such as lubrication, cleaning, and checking fluid levels.
  • Ensured that all safety regulations were followed while operating the concrete pump.
  • Assisted with setting up forms for pouring foundations or walls as needed.
  • Adjusted valves to regulate speed of delivery or flow of material through pipeline.
  • Collaborated with supervisors or other personnel to discuss operational issues or problems encountered during operations.
  • Communicated effectively with customers regarding orders placed and potential delays in service.
  • Followed all company policies related to safety protocols while operating the concrete pump.
  • Calculated amounts of materials required for jobs based on customer specifications.
  • Responded quickly to emergency situations involving malfunctioning pumps or other hazards.
  • Checked machinery parts for wear and tear prior to use each day.
  • Resolved customer complaints promptly in an efficient manner.
  • Operated boom and concrete pump to place concrete in desired locations.
  • Monitored equipment and adjusted controls to start and operate pumps, efficiently meeting schedule demands.

Education

High School Diploma -

BALARA ACADEMY
QUEZON CITY
06-1986

Skills

  • Concrete pump truck driving
  • Concrete pump unloading
  • Concrete placement
  • Site preparation
  • Boom pump operations
  • Boom operation

Languages

FILIPINO
First Language

Timeline

Concrete Pump Operator

ANGUILLA MASONRY PRODUCTS
01.2020 - Current

High School Diploma -

BALARA ACADEMY
GIL CASAS